London Transit Authorities Close Stations for Flooding and Repairs
Transport for London and Network Rail are managing multiple station closures and exit shutdowns across London due to flooding and essential escalator replacements.
London transit authorities are managing several infrastructure closures caused by flooding and aging equipment. Network Rail will close City Thameslink station from May 17 until late December 2027 to replace ten escalators. The existing equipment, in service for over 35 years, suffered accelerated deterioration following recent flooding. While Thameslink trains will continue to operate, they will bypass the station, which serves 7.6 million annual passengers, who are advised to use London Blackfriars instead.
Simultaneously, Transport for London is managing closed subway exits at Turnpike Lane and Manor House stations. At Turnpike Lane, the Ducketts Common subway remains closed for deep cleaning after a Thames Water main leak caused significant flooding. Although Thames Water has completed its repairs, the transit authority must still clear drainage channels before reopening. At Manor House, repairs to several subway exits remain ongoing.
These closures have drawn criticism from local residents and London Assembly member Joanne McCartney, with constituents citing safety concerns over pedestrian detours. Network Rail defended the full closure of City Thameslink as the most efficient way to complete the vital work, while Transport for London acknowledged the frustration caused by the extended duration of the subway closures.