ThinkPatternGet the app
Story
WORLD · AUG 12, 2026

Hungary Builds Danube Structure to Save Paks Nuclear Plant

Prime Minister Peter Magyar announced a riverbed construction project at Paks to prevent a total shutdown of Hungary's primary nuclear power facility during a severe drought.

Prime Minister Peter Magyar announced the construction of a riverbed structure at Paks to raise the water level of the Danube River. The project aims to ensure sufficient cooling for the Paks nuclear facility, which provides 40% of Hungary's electricity. A persistent drought and record-low water levels recently threatened a total plant shutdown, an event that would cost the country 50 billion forint ($159 million) per month.

To provide immediate relief, authorities are deploying two 80-meter barges that may be sunk to raise water levels, a tactic previously employed by Romania. While the plant's output has already dropped significantly—with reports indicating it is operating at only 10% to 25% of its 2,000 megawatt capacity—Magyar stated that energy supplies remain stable. Consequently, the government has lifted previous emergency electricity cutbacks for citizens and state buildings.


Reported across 10 outlets
Actors
Government of Hungary

Keep reading in the app

The full story and every source, free in the app.

Download on the App StoreComing soonGoogle Play